Caspian Dream Liner
02
The Peninsula

A fill a kilometer long

Point of dispute

The plot for the building did not exist: it was built up in the sea. According to a Radio Liberty (Azadliq) report of June 25, 2024, the peninsula extends about 800 meters from the shore.

The same report says that, in response to an inquiry about an environmental review, the Ministry of Ecology replied that an environmental impact assessment for the site had not been submitted. The project's official materials do not touch on this and describe the plot as its “own island.”

We do not presume to judge either side: we have neither the review documents nor a response from the developer. Both versions are given here with dates.

The stone revetment of the shore and turquoise water
The stone revetment of the shore and turquoise water
Waves at the rock revetment, the building in the distance
Waves at the rock revetment, the building in the distance
Aerial view: machinery, sand and the side of the hull
Aerial view: machinery, sand and the side of the hull
The Slipway →What's Being Built →Timeline →
A page of the independent SeaLife guide to the Sea Breeze resort. This is not the official site of the Caspian Dream Liner project or the developer's site: there are no bookings, sales or prices here. Every figure is given with its source, and discrepancies are shown as discrepancies. Guide author: Fariz Ashurov, +994 70 218 80 30.